Ken G's Journal
Home Page: Ken G
East Windsor, NJ, USA
| Total Posts: 101 | Latest Post: 2026-04-17 |
| Table of Contents | RSS Feed |
This weekend I was able to get some things off the list:
* New Tie rods are on
* New Brake calipers are installed, with new brake pads and hoses
- I did brake a star washer so I have to pick one of those up for the driver side.
* New cotter keys installed on the rotors and caps put back on
* Filled up steering rack and sealed with new gasket
* Clean up front sway bar
-Removed old bushings
-Installed new bushings (what a pain)
And then I just ran out of energy. But this leaves me in good shape to:
Install the brake line, install the sway bar, put the tires back on and bleed the brakes.
* New Tie rods are on
* New Brake calipers are installed, with new brake pads and hoses
- I did brake a star washer so I have to pick one of those up for the driver side.
* New cotter keys installed on the rotors and caps put back on
* Filled up steering rack and sealed with new gasket
* Clean up front sway bar
-Removed old bushings
-Installed new bushings (what a pain)
And then I just ran out of energy. But this leaves me in good shape to:
Install the brake line, install the sway bar, put the tires back on and bleed the brakes.




No comments have been posted yet...
Want to leave a comment or ask the owner a question?
Sign in or register a new account — it's free